maanantai 11. elokuuta 2014

Interior project step byt step vol II





DEC 2013 The roof needed to be ready until end of 2013. It was.




JAN2014 First new wall

JAN 2014 Electric system started to rebuilt now

FEB 2014 The first hatch for instument panel



MAR 2014 Changing the holes

Door frames for toilet and front cabin



MAR 2014 The windows challenges

APR 2014 Penry

APR 2014 Painted and polished. Thanks for the Sailing Club and good workshop space for working

APR 2014 Pentry and opened "heater room"
JUN 2014 Saloon

JUN 2014

JUL 2014 Admiral´s garderobe and cabin
JUL 2014 Firs coffee brake in new table
JUL 2014 Drawer
JUL 2014 By what materials?

JUL 2014 Motor and row water filter cover in the same package

JUL 2014
 






 JUL 2014  A few lists still missing but they found they places during our holiday voyage










Interior project step by step
















SEP 2013. Short repair by Lindgren before the big retoration

SEP 2013 Old interior covered with vinyl

"Boat fat"  everywhere

OCT 2013 Final check before reconstructon

OCT 2013 Standing in A-platform at Sailing Club Sindbad

Need some shelter

OCT 2013 Strong dry fiberclass under cover. See rigid strings

OCT 2013 All away, we really mean it!

OCT 2013

NOW 2013 Winter can come
NOV 2013 Almost empty

NOV 2013

 NOV 2013 Old pentry and saloon

NOV 2013


NOV 2013









NOV 2013 Skeleton for wooden panels


 NOV 2013 The first panel in Rear cabin

NOV 2013 Johnny Lydman on his basic position

DEC 2013 Window holes was the most difficult to cover with wood

DEC 2013 Johnny working  with technical corner

Väinämerellä 2014

Ebba was on her vouage again. The trip headed to Estonia Väinäsea. Kärdla might be the best marina in Estonia. Prehaps mostly for Hillar, brave circum navigator and harbourmaster who knows what mean the  sailor´s attitude. We meet again nice Haapsalu, pittoresk Dirham, warm and exiting Tallinna Old City Marina and a few anchor gulfs durint this holiday. When backing home we hit the spectacular thunderstorm. Wind blows in short moment app. 50 knots (25m/s), rain was unbelieveable hard and flaches hit so close the boat that I wonder why not in her mast. But we were lucky this time. Afterward we soo so beautuful rainbow in a horizon. What a show I must say.

Interior, what we built 10 months, worked perfectly. Cabins, hatches, handles, space, all was what I expected. Equipments like spirit stowe (Dometic Origo), Reflex diesel heater and electric systems run like they should in brand new vessel, or even better. I open this project  later by series of monthly photos.
Behind the bar is hatch we want to reach

Front propellers

Tenor fog sireen

Old fachioned curtain from Hanko

So still an quiet in shallow anchor gulf